Before work, working or after work, the concrete mixer operator must pay attention to some issues about the machine. Today, technical personnel from Daswell will briefly introduce what issues should be paid attention to before concrete mixer work in order to maximum improve the machine's work efficiency and guarantee the project smooth progress. In the following, there are five points that the concrete mixer operator should notice before work:

1. Check whether all of the concrete mixer parts connection is firm;

concrete mixer

2. Check whether the concrete mixer oil mass is enough, if not, add qualified fuel to the machine timely;

3. Check whether there is any leakage of the machine;

4. Check whether there is any debris in the machine;

5. Turn the crankshaft several times before starting to improve the friction parts lubrication conditions and reduce the starting resistance.

Any question or support, please fill in the form below,we will get back to you as soon as possible!!

*
*

Related Articles:
Concrete Mixer Sold to Germany! Features Introduction of Twin Shaft Concrete Mixer Daswell Portable Concrete Mixer Can Meet Market Demands Innovative Concrete Mixer Technology to Meet Market Demand Sicoma Twin Shaft Concrete Mixer to Southeast Asia How to Replace the Mixing Blade for Concrete Mixer How to Reduce the Maintenance Cost of Concrete Mixing Machine Mixing Quality of Mini Concrete Mixer Equipment Details of Portable Concrete Mixer Product Knowledge of Reversing Drum Concrete Mixer

Copy Right:Henan Daswell Machinery Co., Ltd. All rights reserved.