News

You are here: Home > News >

Considerations and notes for Daswell concrete mixer installation

1, concrete mixer should be placed on a solid place to support with a stand or stand bar. Not allowed to replace the support with the tyres;

2, before starting the mixer, the operator should check whether all controllers and concrete mixer parts are in good condition and ensure no foreign objects inside the drum;

twin shaft concrete mixer

3, when the feeding hopper of concrete mixer rises, personnel are strictly prohibited through or staying under the hopper;

4, when the mixer is running, it is strictly prohibited to put the tool into the cylinder;

5, after the completion of the work, the operator should fix the mixer hopper well and clean up the machine.

 

Any question or support, please fill in the form below,we will get back to you as soon as possible!!

*
*

Related Articles:
Concrete Mixer Sold to Germany! Features Introduction of Twin Shaft Concrete Mixer Daswell Portable Concrete Mixer Can Meet Market Demands Innovative Concrete Mixer Technology to Meet Market Demand Sicoma Twin Shaft Concrete Mixer to Southeast Asia How to Replace the Mixing Blade for Concrete Mixer How to Reduce the Maintenance Cost of Concrete Mixing Machine Mixing Quality of Mini Concrete Mixer Equipment Details of Portable Concrete Mixer Product Knowledge of Reversing Drum Concrete Mixer

Copy Right:Henan Daswell Machinery Co., Ltd. All rights reserved.